DIY or hire a painter?
Some jobs are perfect for a weekend. Others are cheaper in the end with a painter. An honest checklist to help you decide.
Book your free on-site quote
Short answer
DIY suits a single room with sound walls, a colour you already know, standard ceiling height and no deadline. Hiring a painter makes sense for a whole flat, high ceilings, many cracks or stains, mould, wallpaper removal, woodwork and metal, a fixed handover date, or when you can't take the time off. Either way, check your building's renovation rules first.
Step by step
Count the rooms and surfaces
One bedroom wall is a weekend. A whole flat with ceilings, doors and frames is several days of full-time work, plus drying time.
Check the walls honestly
Look for cracks, flaking paint, stains, mould and old wallpaper. The more preparation, the bigger the job.
Check the height and access
Ceilings above about 3 m, stairwells and duplex flats need proper ladders or platforms.
Check your deadline
A move-out handover or a new tenant arriving leaves no room for a second attempt.
Check the building rules
Ask management about renovation hours, lift use, protection of common areas and rubbish disposal.
Compare like with like
If you get quotes, compare what is included: preparation, number of coats, paint brand and product, protection and clean-up.
The checklist
| Question | DIY is reasonable if… | Consider a painter if… |
|---|---|---|
| How much? | One room or a feature wall | A whole flat, or several rooms at once |
| Wall condition | Sound paint, a few small holes | Many cracks, flaking paint, stains or mould |
| Height | Standard ceilings you can reach safely | High ceilings, stairwells, double-height spaces |
| Surfaces | Walls only | Doors, frames, metal railings, wallpaper removal |
| Colour change | Similar colour, or light over light | Dark to light, or strong colours |
| Time | Flexible, no deadline | A handover date, guests or a move |
| Living arrangements | You can live around a few days of disruption | You need the work fitted around family, pets or work |
Building rules and noise hours in Hong Kong
Under the Noise Control Ordinance, using powered mechanical equipment for construction work between 7pm and 7am, or at any time on Sundays and general holidays, needs a Construction Noise Permit. In practice, most residential buildings set their own house rules for renovation hours, which are often stricter. For example, the Environmental Protection Department's management guidebook gives sample hours such as weekday daytime work, shorter hours on Saturday and no noisy work on Sundays and public holidays.
Painting itself is quiet. Noise usually comes from power sanders, drills and removing fixtures. The EPD has also noted that painting and plastering are not the percussive work targeted by its proposals on noisy domestic renovation. Whoever does the work, check with your management office about:
- Permitted renovation hours, and whether you need to give notice.
- Lift booking and protection for carrying materials.
- Where rubbish, old paint tins and debris can be left, if anywhere.
- Whether workers need to register at the lobby.
- Rules on external walls, balconies and windows, which are often common parts.
The hidden costs of DIY
- Tools and materials: rollers, brushes, trays, ladders, sheets, tape, filler, sandpaper and primer, as well as paint.
- Time: preparation and drying take longer than the painting itself.
- Redoing mistakes: lap marks, drips on floors and patchy coverage often need another coat.
- Protection: paint on floors, built-in furniture or air-con units is hard to remove.
- Disposal: leftover paint and dirty water can't go down the drain.
What to ask a painter
- Will you visit before quoting, and check the walls in person?
- Is preparation listed: filling, sanding, priming?
- Which brand and product, and how many coats?
- How will you protect floors, furniture and common areas?
- Are you insured?
- How do you schedule around my building's rules and my move dates?
- What are the payment terms, and how can I pay?
Our answers: we visit for free and send a written quotation with no obligation; preparation, paint and coats are listed; we cover floors and furniture before we start and clean up after; we're insured; we work within your building's rules; and a 50% deposit confirms the booking, payable by FPS, PayMe, bank transfer or cash. See how our free quote works.
What affects the cost of hiring a painter
We don't publish prices, because no two flats are the same. The main factors are area, wall condition, number of coats, ceiling height, furniture, woodwork, and timing. Our cost factors guide explains each one.
Rather leave it to us?
WhatsApp a few photos of the walls, your location and the dates that suit you. We'll visit for free, check the walls and send a written quotation. No obligation.
Book your free on-site quoteQuestions about this
Is it cheaper to paint my flat myself?
For one room with sound walls, often yes. For a whole flat, or walls that need a lot of preparation, the time, tools and redoing mistakes can close the gap.
Do I need permission to paint inside my flat?
Painting inside your own flat usually doesn't need a permit, but your building's house rules on hours, lifts and common areas still apply. Tenants should check their tenancy agreement.
Can painters work on Sundays in Hong Kong?
Quiet work may be allowed by some buildings, but noisy work with powered equipment is restricted on Sundays and general holidays, and many buildings ban renovation on those days. Check your house rules.
What hours do you work?
We're available 8am to 10pm, 7 days a week, and we always work within your building's rules on renovation hours.
Can I do the prep and leave the painting to you?
Tell us at the visit. We'll check the walls and explain what preparation is still needed before painting.
Sources
Public sources we used for the Hong Kong facts on this page:
- GovHK: Construction noise
- Environmental Protection Department: Management guidebook on construction noise (PDF)
- Environmental Protection Department: Consultation on noise from domestic renovation (PDF)
More painting guides

What affects painting costs
The factors behind a painting quotation, and how to compare quotes fairly.
7 min read →
How to paint walls and ceilings
The order, the technique and the drying times for a clean, even finish.
10 min read →
How to prepare walls for painting
Clean, fill, sand, prime: the prep that decides how long a paint job lasts.
9 min read →
Related services
Book your free on-site quote.
WhatsApp us a few photos of your walls, your location and the dates that suit you. We'll arrange a free visit, from Mid-Levels to Stanley, Discovery Bay or anywhere else in Hong Kong.
Book your free on-site quoteWhatsApp +852 9282 6014