中文

What affects the cost of painting?

We don't publish price lists, because two flats of the same size can need very different work. Here is what actually changes a painting quotation, and how to compare quotes fairly.

7 min readUpdated

Book your free on-site quote
An empty room with grey painted walls and a timber floor

Short answer

A painting quotation depends on the area to be painted, the condition of the walls and how much preparation they need, the number of coats and colours, the paint products, ceiling height and access, whether the rooms are empty or furnished, woodwork and metal, building rules, and your timing. A fair comparison lists all of these. We give a written quotation after a free on-site visit.

Step by step

  1. List the rooms and surfaces

    Note which walls, ceilings, doors, frames, skirting and metal you want painted.

  2. Photograph the problem areas

    Cracks, stains, mould, flaking paint and old wallpaper all change the quote.

    Photograph the problem areas
  3. Decide colours and finishes

    Even a rough idea of colours and how many helps. A big colour change needs more coats.

    Decide colours and finishes
  4. Check your building's rules

    Note renovation hours, lift bookings and any restrictions.

  5. Choose your dates

    Tell us about handover dates and when the rooms will be empty or furnished.

  6. Book a free on-site visit

    WhatsApp the photos, your location and dates. We visit, measure, and send a written quotation.

The cost factors, one by one

FactorWhy it matters
AreaMore wall and ceiling area means more paint and more time. Ceilings take longer than walls.
Wall conditionCracks, holes, flaking paint and uneven walls need filling, sanding, skim coating and primer before any paint goes on.
Damp and mouldThe cause must be fixed first. Cleaning, drying and stain-blocking primer add steps.
Coats and colour changeTwo coats is usual. Dark to light, strong colours and bare plaster can need primer or a third coat.
Number of coloursEach colour means more cutting in and more products.
Paint productsBrand and range, washable or specialist paints, and different products for walls, ceilings and woodwork.
Height and accessHigh ceilings, stairwells and village house exteriors need more equipment and care.
FurnitureMoving and protecting furniture takes time. Empty flats are faster.
Woodwork and metalDoors, frames, skirting, railings and gates take longer per square metre than walls.
WallpaperStripping wallpaper and repairing the wall underneath is a separate job.
Building rulesShort renovation hours, lift booking and protection rules spread the work over more days.
TimingTight handover dates can mean more painters on the job.

How to compare painting quotations

Quotes that look very different often describe different jobs. Before comparing, check that each one says:

  • Exactly which rooms and surfaces are included.
  • What preparation is included: filling, sanding, skim coat, primer.
  • The paint brand, product and finish, and the number of coats.
  • How floors, furniture and common areas will be protected, and who cleans up.
  • The schedule, and how it fits your building's rules.
  • Payment terms and accepted payment methods.
  • Whether the company is insured.

Be careful with quotes given from photos alone. Cracks, damp and old paint only show up properly in person, which is why we always visit first.

Ways to keep the cost down

  • Empty the rooms, or at least clear the walls, before the painters arrive.
  • Keep to one or two colours, and avoid big dark-to-light changes where you can.
  • Fix leaks and damp before booking, so the job is done once.
  • Paint during a vacancy, between tenants or before moving in.
  • Supply your own paint if you already have a brand and colour you like.
  • Combine rooms into one job instead of booking them one by one.

How our quotations work

WhatsApp us a few photos, your location and the dates that suit you. We visit for free, check the walls, measure and talk colours, then send a written quotation. There's no obligation. If you go ahead, a 50% deposit confirms the date, and you can pay by FPS, PayMe, bank transfer or cash. See how our free on-site quote works.

Rather leave it to us?

WhatsApp a few photos of the walls, your location and the dates that suit you. We'll visit for free, check the walls and send a written quotation. No obligation.

Book your free on-site quote

Questions about this

Why don't you publish prices?

Because preparation, coats, access and timing vary so much between flats that a price list would be misleading. We visit for free and give a written quotation instead.

Can you give me a rough price from photos?

Photos help us understand the job, but we give written quotations after a free on-site visit. Cracks, damp and old paint only show up properly in person.

Does the paint brand change the cost much?

It can. Premium and specialist ranges cost more, and some colours need more coats. You can also supply your own paint.

Is preparation charged separately?

Preparation is listed in the written quotation, so you can see exactly what work is included.

How do I pay?

A 50% deposit confirms the booking. You can pay by FPS, PayMe, bank transfer or cash.

More painting guides

Related services

Book your free on-site quote.

WhatsApp us a few photos of your walls, your location and the dates that suit you. We'll arrange a free visit, from Mid-Levels to Stanley, Discovery Bay or anywhere else in Hong Kong.

Book your free on-site quoteWhatsApp +852 9282 6014